Skip Navigation

Skip to Main Content

Bay Bridge Traffic Advisories

Date: Sep 2017

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Sept. 24 – 30, 2017

 

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

TOLL DOLLARS AT WORK

REMINDER: Headlights are required at all times on the bridge.

The eastbound span may be closed Sunday from midnight to 5 a.m. the following morning, Monday through Wednesday from 9 p.m. to 5 a.m. the following morning and Thursday from 10 p.m. to 5 a.m. the following morning for preservation/maintenance work or routine annual inspections.  Two-way traffic will operate on the westbound span during the full eastbound span closures.

The westbound span may be closed Saturday from 10 p.m. to 7 a.m. the following morning the following morning for preservation/maintenance work or routine annual inspections.  Two-way traffic will operate on the eastbound span during the full westbound span closure.

One lane of the westbound span may be closed Monday through Wednesday from 9 a.m. to 2:30 p.m. and Thursday from 9 a.m. to 1 p.m. for preservation/maintenance work. 

Monday through Thursday, one lane will be closed for approximately 15 minutes for contractor pick-up.

FOR 24/7 BAY BRIDGE TRAFFIC INFORMATION CALL 1-877-BAYSPAN (1-877-229-7726) or visit Baybridge.com

Know Before You Go - For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA. Find us at facebook.com/TheMDTA and mdta.maryland.gov. Call 511 or visit MD511.org for statewide travel information.

###

INCREASED WEEKEND TRAFFIC EXPECTED AT BAY BRIDGE Motorists Advised to Travel Off-Peak, Call 1-877-BAYSPAN (229-7726) for Current Traffic Conditions.

Due to Sunfest in Ocean City, Md., motorists should expect higher than normal traffic volumes Thursday, Sept. 21, through Sunday, Sept. 24. The MDTA will monitor traffic conditions throughout the weekend and, weather permitting, implement two-way operations (when one lane of eastbound traffic travels on the westbound span) on the westbound span to help alleviate potential eastbound delays. For motorists' safety, two-way will NOT be implemented in inclement weather. The MDTA encourages motorists to travel off-peak. The best times to travel this weekend are:

  • Thursday and Friday – before 10 a.m. and after 10 p.m.
  • Saturday – before 7 a.m. and after 5 p.m.
  • Sunday – before 10 a.m. and after 10 p.m.

 For the most up-to-date information follow us on Twitter at TheMDTA. Find us on Facebook at facebook.com/TheMDTA. For Statewide traffic conditions, visit md511.org.

Thank you for your patience and cooperation.

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Sept. 17 - 23, 2017

 

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.

TOLL DOLLARS AT WORK

REMINDER: Headlights are required at all times on the bridge.

The eastbound span may be closed Sunday from midnight to 5 a.m. the following morning, Monday through Wednesday from 9 p.m. to 5 a.m. the following morning, Thursday from 11 p.m. to 5 a.m. the following morning and Saturday from 11 p.m. to 5 a.m. the following morning for preservation/maintenance work or routine annual inspections. Two-way traffic will operate on the westbound span during the full eastbound span closures.

One lane of the westbound span may be closed Monday through Wednesday from 9 a.m. to 2:30 p.m. for preservation/maintenance work.

Monday through Thursday, one lane will be closed for approximately 15 minutes for contractor pick-up.

Note: Due to Sunfest in Ocean City, Md., motorists should expect higher than normal traffic volumes Thursday, Sept. 21, through Sunday, Sept. 24. The MDTA encourages motorists to travel off-peak. The best times to travel this weekend are:

  • Friday - before 10 a.m. and after 10 p.m.
  • Saturday - before 7 a.m. and after 5 p.m.
  • Sunday - before 10 a.m. and after 10 p.m.

FOR 24/7 BAY BRIDGE TRAFFIC INFORMATION CALL 1-877-BAYSPAN (1-877-229-7726) or visit Baybridge.com

Know Before You Go - For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA. Find us at facebook.com/TheMDTA and mdta.maryland.gov. Call 511 or visit MD511.org for statewide travel information.

###

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Sept. 10 - 16, 2017

 

All work will be performed weather permitting. The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals. Lane closures are subject to change and closure times are dependent on traffic volumes.

TOLL DOLLARS AT WORK

REMINDER: Headlights are required at all times on the bridge.

The eastbound span may be closed Sunday from midnight to 5 a.m. the following morning, Monday through Wednesday from 9 p.m. to 5 a.m. the following morning and Thursday from 11 p.m. to 5 a.m. the following morning for preservation/maintenance work or routine annual inspections. Two-way traffic will operate on the westbound span during the full eastbound span closures.

The westbound span may be closed Saturday from 11 p.m. to 5 a.m. the following morning the following morning for preservation/maintenance work or routine annual inspections. Two-way traffic will operate on the eastbound span during the full westbound span closure.

One lane of the eastbound span may be closed Monday and Tuesday from 9 a.m. to 2:30 p.m. for preservation/maintenance work. Two-way traffic will operate on the westbound span.

One lane of the westbound span may be closed Wednesday from 9 a.m. to 2:30 p.m. and Thursday from 9 a.m. to 1 p.m. for preservation/maintenance work.

When daytime two-way traffic is in effect on the westbound span, toll lanes 1 through 5, on the left side of the toll plaza, will be directed into contra-flow traffic on the westbound span. Motorists wishing to use an E-ZPass® Only lane to access the eastbound span should use toll lanes 6 or 9.

Monday through Thursday, one lane will be closed for approximately 15 minutes for contractor pick-up.

The MDTA offers the following travel tips for the summer months:

· Travel off-peak when heading to and from the Eastern Shore. The best times to travel the Bay Bridge on weekends include:

  • Friday - before 10 a.m. and after 10 p.m.
  • Saturday - before 7 a.m. and after 5 p.m.
  • Sunday - before 10 a.m. and after 10 p.m.

FOR 24/7 BAY BRIDGE TRAFFIC INFORMATION CALL 1-877-BAYSPAN (1-877-229-7726) or visit Baybridge.com

Know Before You Go - For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA. Find us at facebook.com/TheMDTA and mdta.maryland.gov. Call 511 or visit MD511.org for statewide travel information.

###

Bay Bridge (US 50/301)

Lane Closures and Traffic Patterns

Scheduled for the Week of Sept. 6 – 9, 2017

All work will be performed weather permitting.  The MDTA urges motorists to drive with caution and obey all traffic-control devices and lane-control signals.  Lane closures are subject to change and closure times are dependent on traffic volumes. 

TOLL DOLLARS AT WORK

REMINDER: Headlights are required at all times on the bridge.

The eastbound span may be closed Wednesday from 9 p.m. to 5 a.m. the following morning and Thursday from 10 p.m. to 5 a.m. the following morning for preservation/maintenance work or routine annual inspections.  Two-way traffic will operate on the westbound span during the full eastbound span closures.

The westbound span may be closed Saturday from 10 p.m. to 7 a.m. the following morning the following morning for preservation/maintenance work or routine annual inspections.  Two-way traffic will operate on the eastbound span during the full westbound span closure.

One lane of the westbound span may be closed Wednesday from 9 a.m. to 2:30 p.m. and Thursday from 9 a.m. to 1 p.m. for preservation/maintenance work. 

Wednesday and Thursday, one lane will be closed for approximately 15 minutes for contractor pick-up.

The MDTA offers the following travel tips for the summer months:

· Travel off-peak when heading to and from the Eastern Shore. The best times to travel the Bay Bridge on weekends include:

  • Friday - before 10 a.m. and after 10 p.m.
  • Saturday - before 7 a.m. and after 5 p.m.
  • Sunday - before 10 a.m. and after 10 p.m.

FOR 24/7 BAY BRIDGE TRAFFIC INFORMATION CALL 1-877-BAYSPAN (1-877-229-7726) or visit Baybridge.com

Know Before You Go - For real-time updates on major incidents follow us on Twitter at twitter.com/TheMDTA. Find us at facebook.com/TheMDTA and mdta.maryland.gov. Call 511 or visit MD511.org for statewide travel information.

###

WAS THIS PAGE HELPFUL?